Close Menu
  • Home
  • Daily
  • AI
  • Crypto
  • Bitcoin
  • Stock Market
  • E-game
  • Casino
    • Online Casino bonuses
  • World
  • Affiliate News
  • English
    • Português
    • English
    • Español

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

What's Hot

Inpay Faces iGaming Growth Freeze After AML Review

August 20, 2026

Take-Two May Be Entering a Brand-New AAA Field After GTA 6, Report Says

August 20, 2026

GnosisDAO Approves Gnosis Chain for Ethereum Economic Zone

August 20, 2026
Facebook X (Twitter) Instagram
MetaDaily – Breaking News in Crypto, Markets & Digital Trends
  • Home
  • Daily
  • AI
  • Crypto
  • Bitcoin
  • Stock Market
  • E-game
  • Casino
    • Online Casino bonuses
  • World
  • Affiliate News
  • English
    • Português
    • English
    • Español
MetaDaily – Breaking News in Crypto, Markets & Digital Trends
Home » TerraPower’s nuclear reactor has a secret weapon for powering AI data centers
AI

TerraPower’s nuclear reactor has a secret weapon for powering AI data centers

adminBy adminAugust 19, 2026No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
Share
Facebook Twitter LinkedIn Pinterest Email
Up to $1500 Welcome Bonus
+50 Freespins
Always 25% Bonus with every Crypto Deposit!
Join Now


Nuclear power startups have been pitching themselves as the antidote to what ails AI data centers: power that’s always available. Bill Gates-founded TerraPower is one of the latest to throw its hat that into that ring, with Bloomberg reporting that the startup plans to announce its first data center project this year.

TerraPower did not say who the customer will be, though in January, it announced that Meta had agreed to buy eight of its Natrium power plants. The data center project, expected to break ground in 2027, would be the company’s second power plant, with its first already under construction in Wyoming.

Not every nuclear reactor is suited to data center duty, but TerraPower possesses one key advantage — energy storage — that promises to give it an edge over competitors. And it’s all thanks to renewable power sources like wind and solar.

Nuclear reactors, TerraPower’s included, work best when they’re running at full tilt. Of all the different types of power plants, nuclear reactors have the highest capacity factor — 92.5% of the time, they generate at maximum power in the U.S. But in a way, they need to be. Existing reactors are slow to ramp up and down, capable of increasing or decreasing only about 5% of their total rated output per minute, according to the National Laboratory of the Rockies. 

New small modular reactors (SMRs), which many startups are pursuing, can react faster, about 10% of their rated output per minute, per NRL. But running at reduced capacity isn’t ideal — it’s hard to make money when you’re not generating electrons. 

That’s true of any power plant, but it’s especially true of nuclear, which has the highest capital expenditures of any generating technology. Startups are hoping that mass manufacturing of SMRs will bring capex down, but that has yet to be proven. And if it does work, it could take a decade or more to reap the benefits. Every startup acknowledges that its early power plants will be expensive, so it makes sense to operate it them at peak capacity as often as possible.

For data centers, especially those that rely on behind-the-meter power, that poses a challenge. Their loads, especially when training AI or responding to prompts, can sink and soar quickly as GPUs respond to the tasks. The swings are so demanding that natural gas turbines have been breaking under the stress. To smooth the curve, they need to use large banks of batteries, which increase costs further.

TerraPower designed its 345-megawatt molten salt-cooled reactor to work around those challenges. One of the key considerations was ensuring the reactor could complement intermittent sources of electricity like wind and solar — the power plant needed to ramp up and down quickly. While TerraPower had renewable power, not data centers, in mind when it sketched its plans, the two are similarly intermittent, just on different sides of the equation.

To ramp quickly, TerraPower doesn’t increase or decrease the power output of its reactor. Rather, it keeps on splitting atoms, and the extra heat gets stored in a giant vat of molten sodium. When power demand spikes, the power plant can tap that reservoir to generate more steam to spin the turbines. The expensive equipment keeps working even when demand is low, allowing the company to amortize its investment over more operational hours.

The approach takes the best of nuclear power — high capacity factor — and pairs it with an energy storage technology that allows TerraPower to play nicely on a renewable-heavy grid or when connected to an data center. It’s a flexible approach that could give the startup an advantage in the race to power AI.

When you purchase through links in our articles, we may earn a small commission. This doesn’t affect our editorial independence.



Source link

Up to $1500 Welcome Bonus
+50 Freespins
Always 25% Bonus with every Crypto Deposit!
Join Now
Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
Previous ArticleMayor Mamdani suing to block bill giving NYC paraprofessionals $10,000 boost
Next Article HSBC, Standard Chartered Execute First Live Transaction on Swift Blockchain
admin
  • Website

Related Posts

Stripe didn’t really buy OpenRouter because of the ‘singularity’

August 19, 2026

OpenAI seeks to one-up Anthropic with new customer privacy protections

August 19, 2026

AI was supposed to win people over by now — it hasn’t

August 19, 2026

Relativity Networks raises $22 million to bring a faster kind of fiber to data centers

August 19, 2026
Leave A Reply Cancel Reply

Our Picks

Voluptatem aliquam adipisci dolor eaque

April 24, 2025

Funeral of Pope Francis Coincides with King’s Day Celebrations in the Netherlands and Curaçao

April 24, 2025

Curaçao’s Waste-to-Energy Plant Remains Unfeasible Due to High Costs

April 23, 2025

Dutch Ministers: No Immediate Threat from Venezuela to ABC Islands

April 23, 2025
Don't Miss
Affiliate Network News

Awin Wins Big at Global Performance Awards 2025

By adminOctober 22, 20250

Awin and our partners made this year’s Global Performance Marketing Awards one to remember, claiming…

Awin Shortlisted 11 Times at GPMA 2025

September 11, 2025

Awin’s CPI Recovers $100M in Affiliate Revenue

September 11, 2025

Awin and Birl partner to transform resale into a scalable growth engine for brands

August 28, 2025
About Us
About Us

Welcome to MetaDaily.io — Your Daily Pulse on the Digital Frontier.

At MetaDaily.io, we bring you the latest, most relevant, and most exciting news from the world of affiliate networks, cryptocurrency, Bitcoin, egaming, and global markets. Whether you’re an investor, gamer, tech enthusiast, or digital entrepreneur, we provide the insights you need to stay ahead of the curve in this fast-moving digital era.

Our Picks

Inpay Faces iGaming Growth Freeze After AML Review

August 20, 2026

Australia Gambling Bill Adds Online Ad Opt-Out Register

August 19, 2026

Finland Court Changes Online Slot Winnings Tax Approach

August 18, 2026

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

Facebook X (Twitter) Instagram Pinterest
  • Home
  • About Us
  • Advertise With Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 metadaily. Designed by metadaily.

Type above and press Enter to search. Press Esc to cancel.