Close Menu
  • Home
  • Daily
  • AI
  • Crypto
  • Bitcoin
  • Stock Market
  • E-game
  • Casino
    • Online Casino bonuses
  • World
  • Affiliate News
  • English
    • Português
    • English
    • Español

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

What's Hot

This “Addictive” Period Drama Show is a Must Watch (& It Has Another Season Coming Soon)

April 20, 2026

Aave’s TVL Falls $8B After $293M Kelp DAO Hack

April 20, 2026

Arceus, Z-A, Scarlet and Violet Almost Mandatory

April 19, 2026
Facebook X (Twitter) Instagram
MetaDaily – Breaking News in Crypto, Markets & Digital Trends
  • Home
  • Daily
  • AI
  • Crypto
  • Bitcoin
  • Stock Market
  • E-game
  • Casino
    • Online Casino bonuses
  • World
  • Affiliate News
  • English
    • Português
    • English
    • Español
MetaDaily – Breaking News in Crypto, Markets & Digital Trends
Home » xAI is facing a lawsuit for operating over 400 MW of gas turbines without permits
AI

xAI is facing a lawsuit for operating over 400 MW of gas turbines without permits

adminBy adminJune 18, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
Share
Facebook Twitter LinkedIn Pinterest Email
Up to $1500 Welcome Bonus
+50 Freespins
Always 25% Bonus with every Crypto Deposit!
Join Now


The Colossus data center operated by xAI outside of Memphis is facing a lawsuit for operating a fleet of natural gas turbines without permits.

“Over the past year, xAI has installed and operated at least 35 combustion turbines and other sources of air pollution at the Colossus site without ever obtaining the necessary preconstruction or operating air permits,” the Southern Environmental Law Center (SELC) wrote in a letter to xAI.

The legal group submitted the letter on behalf of the NAACP. It serves as a notice for intent to sue xAI for violations of the Clean Air Act. The law requires organizations to submit such a letter 60 days in advance of filing a lawsuit. 

The gas turbines have the potential to emit more than 2,000 tons of NOx per year, a group of chemicals that contribute to smog. 

Memphis already “had some of the worst air quality in the region,” SELC notes. “In 2024, Memphis was deemed an asthma capital of the nation by the Asthma and Allergy Foundation of America due to high rates of emergency room visits and deaths from asthma.”

SELC alleges that xAI failed to obtain permits required by both the federal and local regulators before installing the generators. It also alleges that the company wasn’t operating them with proper air pollution controls. At one point, xAI had enough turbines to generate 421 megawatts of electricity.

Last summer, the Shelby County Health Department (SCHD), which oversees local air pollution compliance, “told reporters that xAI’s turbines were exempt from permitting, although SCHD still had not disclosed publicly what xAI was operating on its site nor the legal basis for any such exemption,” SELC said.

To determine what was happening at the Colossus site, SELC paid an aerial photographer to capture images of the facility in March. The photos revealed that xAI had installed 35 turbines around the perimeter of the data center at the time. Thermal images taken about a month later showed that at least 33 of them were operational, SELC said.

After those images were taken, the Greater Memphis Chamber, a local economic development agency, said that xAI had removed some of the turbines.

“The temporary natural gas turbines that were being used to power the Phase I GPUs prior to grid connection are now being demobilized and will be removed from the site over the next two months,” the Memphis Chamber said. “About half of the operating turbines will remain” until a second substation completes the data center’s connection to the grid, the organization added, and that once the substation was complete, the turbines would serve as backups.

But a flight on June 15 showed that at least 26 turbines remained, including three new ones that had been installed since the April flight. The total generating capacity was around 407 megawatts, just 14 megawatts shy of the previous amount.

“With very few exceptions — none of which apply here — new sources of criteria and other air pollutants in Tennessee must obtain preconstruction approval in the form of an air permit as well as a permit to operate and emit pollutants,” SELC said. 



Source link

Up to $1500 Welcome Bonus
+50 Freespins
Always 25% Bonus with every Crypto Deposit!
Join Now
air pollution colossus data centers natural gas xAI
Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
Previous ArticleOpenAI found features in AI models that correspond to different ‘personas’
Next Article It’s the End of an Era for the PS4
admin
  • Website

Related Posts

OpenAI’s existential questions | TechCrunch

April 19, 2026

The 12-month window | TechCrunch

April 19, 2026

Palantir posts mini-manifesto denouncing inclusivity and ‘regressive’ cultures

April 19, 2026

AI chip startup Cerebras files for IPO

April 18, 2026

Comments are closed.

Our Picks

Voluptatem aliquam adipisci dolor eaque

April 24, 2025

Funeral of Pope Francis Coincides with King’s Day Celebrations in the Netherlands and Curaçao

April 24, 2025

Curaçao’s Waste-to-Energy Plant Remains Unfeasible Due to High Costs

April 23, 2025

Dutch Ministers: No Immediate Threat from Venezuela to ABC Islands

April 23, 2025
Don't Miss
Affiliate Network News

Awin Wins Big at Global Performance Awards 2025

By adminOctober 22, 20250

Awin and our partners made this year’s Global Performance Marketing Awards one to remember, claiming…

Awin Shortlisted 11 Times at GPMA 2025

September 11, 2025

Awin’s CPI Recovers $100M in Affiliate Revenue

September 11, 2025

Awin and Birl partner to transform resale into a scalable growth engine for brands

August 28, 2025
About Us
About Us

Welcome to MetaDaily.io — Your Daily Pulse on the Digital Frontier.

At MetaDaily.io, we bring you the latest, most relevant, and most exciting news from the world of affiliate networks, cryptocurrency, Bitcoin, egaming, and global markets. Whether you’re an investor, gamer, tech enthusiast, or digital entrepreneur, we provide the insights you need to stay ahead of the curve in this fast-moving digital era.

Our Picks

Platipus Gaming Secures Ontario Supplier Licence

April 17, 2026

How It Works, Legal Battles, and Rapid Growth Explained

April 16, 2026

Internet Vikings Backs RubyPlay West Virginia Launch

April 16, 2026

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

Facebook X (Twitter) Instagram Pinterest
  • Home
  • About Us
  • Advertise With Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • DMCA
© 2026 metadaily. Designed by metadaily.

Type above and press Enter to search. Press Esc to cancel.